Work on the site continues. The demolition of the old shed is at an advanced stage and the foundation for the new meeting room(originally band room) is well underway. The slab is probably the easiest foundation to build. It is a flat concrete pad poured directly on the ground. It takes very little site preparation, very little formwork for the concrete and very little labour to create. The electrical fittings have also started being installed.